No title

JAI HIND IAS ACADEMY

TNPSC Model Question Paper 

1. A can do a work in 12 days; B in 6 days and C in 3 days. A and B start working together and after a day C joins them. The total number of days required to complete the work is
A xU ntiyia 12 ehl;fspYk; B kw;Wk; C mnj ntiyia 3 ehl;fspYk; Kof;fpd;wdh;/ At[k; Ba[k; nrh;e;J ntiyia bjhl';fp xU ehSf;F gpwF C mth;fSld; te;J nrh;fpwhh; vdpy; me;j ntiyia Kof;f bkhj;jk; vj;jid ehl;fs; njitg;gLk;?

A) 2  2/7 days                                     B) 1 2/7 days
C) 2 1/7 days                                      D) 1 1/7 days

2. A and B can together finish a work in 30 days. They worked at it for 20 days and then B left. The remaining work was done by A alone in 20 more days. A alone can finish the work in
At[k; Ba[k; nrh;e;J xU ntiyia 30 ehl;fspy; Kof;fpd;wdh;/ mth;fs; 20 ehl;fs; ntiy ghh;j;j gpwF B brd;WtpLfpwhh;/ kPjKs;s ntiyia B kl;Lk; Kof;f A ,d;Dk; 20 ehl;fs; vLj;Jbfhs;fpwhh; vdpy; A kl;Lk; mt;ntiyia Kof;f vj;jid ehl;fs; vLj;Jf; bfhs;thh;?

A) 48 days                                           B) 50 days
C) 54 days                                           D) 60 days

3. A and B can together do a piece of work in 30 days. B alone can do it in 40 days. A alone can do it in
A kw;Wk; B ,UtUk; nrh;e;J xU ntiyia 30 ehl;fspy; Kof;fpd;wdh;/ B kl;Lk; mt;ntiyia Kof;f 40 ehl;fs; vLj;Jf;bfhs;fpwhh; vdpy; A kl;Lk; mt;ntiyia Kof;f vj;jid ehl;fs; vLj;Jf; bfhs;thh;?

A) 100 days                                         B) 140 days
C) 120 days                                         D) 180 days

4. A and B together can do a work in 6 days. B can do the same work in 15 days. In how many days can A do the same work?
A kw;Wk; B ,UtUk; nrh;e;J xU ntiyia 6 ehl;fspy; Kof;fpd;wdh;/ B kl;Lk; mt;ntiyia 15 ehl;fspy; Kof;fpd;whh; vdpy; A kl;Lk; mt;ntiyia Kof;f vj;jid ehl;fs; vLj;Jf; bfhs;thh;?

A) 10 days                                           B) 9 days
C) 7 days                                             D) 20 days

5. A and B can together do a piece of work in 15 days. B alone can do it in 20 days. A alone
A kw;Wk; B ,UtUk; nrh;e;J xU ntiyia 15 ehl;fspy; Kof;fpd;wh;/ B kl;Lk; mt;ntiyia 20 ehl;fspy; Kof;fpd;whh; vdpy; A kl;Lk; jdpna bra;a vj;jid ehl;fs; vLj;Jf;bfhs;thh;?

A) 30 days                                                       B) 40 days
C) 45 days                                                       D) 60 days


6. A and B can do a work in 8 days, B and C in 12 days, C and A in 24 days. If A, B and C work together, then the number of days, they will complete the work is
A kw;Wk; B ,UtUk; nrh;e;J xU ntiyia 8 ehl;fspYk;. B kw;Wk; C ,UtUk; nrh;e;J xU ntiyia 12 ehl;fspYk;. C kw;Wk; A nrh;e;J xU ntiyia 24 ehl;fspYk; Kof;fpd;wdh; vdpy; A, B, C |tUk; nrh;e;J mt;ntiyia Kof;f vj;jid ehl;fs; vLj;Jf; bfhs;th;?

A) 6                                                      B) 7
C) 8                                                      D) 4

More Details Visit Our Site : www.jaihindiasacademy.com

Any Queries Feel free to call our Toll Free no: 1800-123-8055


To Top